McDermott has secured a front-end engineering design (FEED) contract with Repsol for two oil fields that form part of a development project in the Gulf of Mexico’s Block 29 off the coast of Mexico.
The post McDermott scores FEED assignment at oil project in Gulf of Mexico appeared first on Offshore Energy.