Kraken Robotics completes cable burial survey of Gode Wind 3 OSS to Dolwin Kappa link
Kraken Robotics has completed a cable burial survey on behalf of Asso.subsea along the 16-kilometer export cable that runs from the Gode Wind 3 offshore substation to the Dolwin Kappa platform. Source: Kraken Robotics The operation was conducted from the MSV Astrea, employing the advanced Sub-Bottom Imager™ (SBI). Kraken Robotics said that SBI was tasked …
Kraken Robotics completes cable burial survey of Gode Wind 3 OSS to Dolwin Kappa link Read More »
