Equinor has started the ball rolling to develop its controversial Bay du Nord oil project off the coast of Newfoundland and Labrador by awarding preliminary front-end engineering design (pre-FEED) work to BW Offshore and Altera Infrastructure.
The post Canada’s stalled $12-billion oil project takes step forward with new FPSO awards appeared first on Offshore Energy.